Sōtetsu–JR Link Line

Sōtetsu–JR Link Line
Overview
Native name相鉄・JR直通線
StatusOperational
Owner
LocaleTokyo, Kanagawa prefectures
Termini
Stations18
Service
Depots
  • Kashiwadai (Sotetsu)
  • Kawagoe (JR East)
History
Opened30 November 2019 (30 November 2019)
Technical
Line length57 km (35 mi)
Track gauge1,067 mm (3 ft 6 in)
Electrification1,500 V DC overhead catenary
Operating speed120 km/h (75 mph)
Route map
Sōtetsu–JR Link Line

Kawagoe
JR Kawagoe Line
Ōmiya
Musashi-Urawa
Akabane
JR
Saikyō Line
(Akabane Line)
Ikebukuro
JR
Yamanote
Freight Line
Shinjuku
Shibuya
Ebisu
Ōsaki
JR Yamanote Freight Line Right arrow
Nishi-Ōi
Musashi-Kosugi
Left arrow
to Shin-yokohama
(since March 2023)
JR
Shōnan–Shinjuku Line,
Yokosuka Line
Right arrow
Hazawa
yokohama-kokudai
Nishiya
Sōtetsu Main Line
Futamata-gawa
Ebina

Key to symbols

operational boundary
existing rail network
stations omitted for brevity
since 30 November 2019
Preview warning: Using more than one of the following parameters in Template:Infobox rail line: color2, color.

The Sōtetsu–JR Link Line (Japanese: 相鉄・JR直通線, Hepburn: Sōtetsu JR Chokutsū-sen) is a section of the Eastern Kanagawa Rail Link project which connects the Sōtetsu Main Line to the JR East Saikyō Line via the tracks of the Sōtetsu Shin-Yokohama Line and the Tōkaidō Freight Line. It was constructed and is owned by the Japan Railway Construction, Transport and Technology Agency (JRTT). The service and operations are publicly described as Through service to Sōtetsu Line (相鉄線直通, Sōtetsu Chokutsū-sen) by JR East, and as Thru to JR Line (JR線直数運転, JR-sen Chokutsū Unten) by Sagami Railway (Sotetsu).