Rookwood Weir
| Rookwood Weir | |
|---|---|
Rookwood Weir Location of the weir in Queensland | |
Interactive map of Rookwood Weir | |
| Official name | Managibei Gamu (in Darumbal language) |
| Country | Australia |
| Location | Gogango, Central Queensland |
| Coordinates | 23°32′28″S 150°00′55″E / 23.541013°S 150.015273°E |
| Purpose |
|
| Status | Operational |
| Construction began | 2020 |
| Opening date | 22 November 2023 |
| Construction cost | A$568.9 million |
| Built by | Acciona |
| Designed by | GHD Group |
| Operator | SunWater |
| Dam and spillways | |
| Type of dam | Barrage |
| Impounds | Fitzroy River |
| Height (foundation) | 16.2 m (53 ft) |
| Length | 350 m (1,150 ft) |
| Spillway type | Uncontrolled |
| Spillway length | 202 m (663 ft) |
| Reservoir | |
| Total capacity | 86,000 ML (70,000 acre⋅ft) |
| Active capacity | 74,325 ML (60,256 acre⋅ft) |
| Surface area | 1,930 ha (4,800 acres) |
| Maximum length | 60 km (37 mi) (shoreline) |
| Normal elevation | 46.2 m (152 ft) AHD |
| Website sunwater.com.au | |
The Rookwood Weir (Darumbal: Managibei Gamu, meaning keeping – saving [water]) is a concrete weir across the Fitzroy River, located near Gogango, approximately 66 kilometres (41 mi) south-west of Rockhampton, in Central Queensland, Australia. The weir was constructed to assist with the supply of water for agriculture, potable water for the Livingstone Shire Council, and industrial needs.