Riyadh Metro

Riyadh Metro
قطار الرياض
Metro Interior
Overview
Native nameقطار الرياض
OwnerRiyadh City Royal Commission
LocaleRiyadh, Saudi Arabia
Transit typeRapid Transit
Number of lines
6
Line number 1   2   3   4   5   6 
Number of stations
85
Websiterpt.sa/en/
Operation
Began operation
1 December 2024 (2024-12-01)
CharacterElevated & Underground
Number of vehicles
586 cars
Train length2–4 coaches
Headway3 to 7 minutes
Technical
System length176 km (109 mi)
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge

The Riyadh Metro is a rapid transit system serving Riyadh, the capital of Saudi Arabia. Part of the King Abdulaziz Project for Riyadh Public Transport, it is the longest fully automated, driverless metro in the world.

The system consists of six lines connecting 85 stations spanning a combined length of 176 kilometres (109 mi). This is the second metro system in Saudi Arabia, after the Sacred Sites Metro Line in Mecca, the fourth on the Arabian Peninsula, sixth in the Arab World, and fifteenth in the Middle East. The project cost $22.5 billion to build. It was opened on December 1, 2024.