Regina Saskatchewan Temple

Regina Saskatchewan Temple
Interactive map of Regina Saskatchewan Temple
Number65
Dedication14 November 1999, by Boyd K. Packer
Site1 acre (0.40 ha)
Floor area10,700 ft2 (990 m2)
Height71 ft (22 m)
Official website • News & images
Church chronology
←
Halifax Nova Scotia Temple

Regina Saskatchewan Temple
→
Billings Montana Temple
Additional information
Announced3 August 1998, by Gordon B. Hinckley
Groundbreaking14 November 1998, by Hugh W. Pinnock
Open house5–6 November 1999
Current president
Doug Robertson
Designed byRoger B. Mitchell and Church A&E Services
LocationRegina, Saskatchewan, Canada
Coordinates50°25′15.53159″N 104°32′30.04799″W / 50.4209809972°N 104.5416799972°W / 50.4209809972; -104.5416799972
Exterior finish
Light gray granite
DesignClassic modern, single-spire design
Baptistries1
Ordinance rooms
2 (two-stage progressive)
Sealing rooms
2

The Regina Saskatchewan Temple is a temple of the Church of Jesus Christ of Latter-day Saints in Regina, Saskatchewan, Canada. The intent to build the temple was announced on August 3, 1998, by church president Gordon B. Hinckley while traveling in Canada. The temple is the first in Saskatchewan and the fourth in Canada. The temple was dedicated on November 14, 1999, by Boyd K. Packer, acting president of the Quorum of the Twelve Apostles. It was the first time in church history that two temples were dedicated on the same day.

The 10,700-square-foot structure is constructed of light gray granite and is on 3.2 acres of land. A seven-foot angel Moroni statue sits on top of the temple spire. The temple was designed by Roger B. Mitchell of Banadyga Mitchell Partnership and church architectural and engineering employees, using a classic modern style.

A groundbreaking ceremony was held on November 14, 1998, conducted by Hugh W. Pinnock, a general authority and president of the church's North America Central Area. The temple faced significant construction challenges, including a truckers' strike that delayed materials until days before the dedication, requiring crews to work around the clock to complete the exterior.