Redmond Technology station
View of the light rail station from an overpass on NE 40th St. | ||||||||||||||||
| General information | ||||||||||||||||
| Location | 3929 156th Avenue Northeast Redmond, Washington United States | |||||||||||||||
| Coordinates | 47°38′41″N 122°08′01″W / 47.64472°N 122.13361°W | |||||||||||||||
| Owner | Sound Transit | |||||||||||||||
| Platforms | 1 island platform | |||||||||||||||
| Tracks | 2 | |||||||||||||||
Train operators | Sound Transit | |||||||||||||||
| Bus stands | 6 | |||||||||||||||
| Bus operators | King County Metro (RapidRide) Sound Transit Express | |||||||||||||||
| Construction | ||||||||||||||||
Structure type | At-grade | |||||||||||||||
| Parking | 222 spaces | |||||||||||||||
Cycle facilities | Lockers and racks | |||||||||||||||
| Accessible | Yes | |||||||||||||||
| History | ||||||||||||||||
| Opened | 4 February 2002 (bus station) April 27, 2024 (rail station) | |||||||||||||||
| Rebuilt | 2017–2024 | |||||||||||||||
| Former names | Overlake Transit Center (2002–2017) | |||||||||||||||
| Passengers | ||||||||||||||||
| 898 daily weekday boardings (2025) 282,401 total boardings (2025) | ||||||||||||||||
| Services | ||||||||||||||||
| ||||||||||||||||
| ||||||||||||||||
Redmond Technology station, formerly Overlake Transit Center, is a light rail and bus station in Redmond, Washington, United States. It is adjacent to State Route 520 on the headquarters campus of Microsoft. The station is served by the 2 Line, part of Sound Transit's Link light rail system, and several King County Metro and Sound Transit Express routes. The bus station originally opened in 2002 and was replaced by a new facility that was constructed along the light rail line, which opened on April 27, 2024. Redmond Technology served as the terminus of the 2 Line until an extension to Downtown Redmond station opened in 2025.