Rawalpindi–Islamabad Metrobus

Rawalpindi–Islamabad Metrobus
Overview
SystemRawalpindi–Islamabad Metrobus
OperatorPunjab Mass Transit Authority, Capital Mass Transit Authority and Capital Development Authority (Islamabad)
Government of Pakistan
Vehicles99
StatusActive
Began service4 June 2015 (2015-06-04)
Routes
Routes4
LocaleIslamabad–Rawalpindi metropolitan area
Stops50

Saddar, Rawalpindi – Pak Secretariat

Peshawar Morr Interchange – New Islamabad International Airport
Service
LevelDaily
FrequencyRed Line BRT: 3 Minutes

Orange Line BRT: 5–10 minutes

Green and Blue Lines: 6 minutes

Islamabad Feeder Routes: 10 minutes
Operates6:15am–10:00pm
Ridership100,558 (Red Line) + 20,000 (Orange Line)
Route map
Islamabad Rawalpindi Metro Map
← {{{previous_line}}}  {{{system_nav}}}  {{{next_line}}} →

The Rawalpindi-Islamabad Metrobus is a 83.6 km (51.9 mi) bus rapid transit system operating in the Islamabad–Rawalpindi metropolitan area of Pakistan. It consists of four routes, namely the Red, Orange, Blue, and Green Lines. The Red and Orange Lines have dedicated lanes with proper stations built along them, while the Blue and Green Lines currently run along the Islamabad Expressway and Srinagar Highway respectively, along with regular traffic.

The Metrobus network's Red Line was the first to be opened, on 4 June 2015, and stretches 22.5 kilometres between Pak Secretariat, in Islamabad, and Saddar in Rawalpindi. The second route, the Orange Line, stretches 25.6 kilometres between the Peshawar Morr Interchange and the Islamabad International Airport, and was inaugurated on 18 April 2022. On 7 July 2022, the Green and Blue Lines were added to this Metrobus network.

The system uses e-ticketing and an Intelligent Transportation System (ITS), where the Red Line is managed by the Punjab Mass Transit Authority (PMTA) while the rest are being managed by the Capital Development Authority (CDA).

On 25 November 2023, the CDA announced that it would be importing 160 buses from China, to operate on routes defined by the CDA and operated by the NRTC. One batch was set to arrive in January, while the other was set to arrive in February or March. On 7 January the first batch of 30 buses arrived in Islamabad. On 1 April, a batch of 30 buses from China was scheduled to be received at Karachi and from there reach Islamabad within three weeks. On 22 May, a batch arrived in Karachi. On 4 June 2024 a batch of 30 buses was received in Islamabad.