Raja Uda MRT station
PY19 Raja Uda – Institut Jantung Negara | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
Raja Uda MRT station | |||||||||||
| General information | |||||||||||
| Other names | |||||||||||
| Location | Jalan Raja Muda Abdul Aziz, Kampung Baru 50300 Kuala Lumpur Malaysia | ||||||||||
| Coordinates | 3°10′04″N 101°42′40″E / 3.1678°N 101.7112°E | ||||||||||
| System | |||||||||||
| Owner | MRT Corp | ||||||||||
| Operator | Rapid Rail | ||||||||||
| Line | 12 Putrajaya Line | ||||||||||
| Platforms | 1 island platform | ||||||||||
| Tracks | 2 | ||||||||||
| Construction | |||||||||||
Structure type | Underground | ||||||||||
| Depth | 21.3 metres (70 ft) | ||||||||||
| Parking | Available | ||||||||||
| Accessible | Yes | ||||||||||
| Other information | |||||||||||
| Status | Operational | ||||||||||
| Station code | PY19 | ||||||||||
| History | |||||||||||
| Opened | 16 March 2023 | ||||||||||
| Former names | Raja Uda–UTM (2023-2026) | ||||||||||
| Services | |||||||||||
| |||||||||||
| |||||||||||
The Raja Uda MRT station, also known as Raja Uda–Institut Jantung Negara MRT station under the station naming rights programme, is a mass rapid transit (MRT) station that serves the neighborhood of Kampung Baru in Kuala Lumpur, Malaysia. It is one of the stations on the MRT Putrajaya Line.
The station began operations on 16 March 2023. It was previously known as Raja Uda–UTM MRT station under the station naming rights programme from 2023 to 2026, with the naming rights given to the University of Technology Malaysia (UTM). Currently, it is named after the National Heart Institute (IJN).