Proposals for new tram lines in Edinburgh

Various studies, from 1989 onwards, considered the reintroduction of trams to Edinburgh. In 2001, a proposal for a new Edinburgh Trams network envisaged three routes across the city, Lines 1, 2 and 3. Line 1 was a circular route running around the northern suburbs, with the other two forming radial lines running out to Newbridge in the west and to Newcraighall in the south respectively. All lines would run through the city centre.

Line 3 was later shelved due to lack of Scottish Parliament approval. Lines 1 and 2 were combined and split into three phases, with Phase 1 being further divided into Phase 1a and 1b. Phases 1b, 2 and 3 were not funded.

When the tramway opened to passengers in 2014, only a truncated section of the planned Phase 1a line (running from the airport to the city centre) had been constructed. Construction of the remainder of the Phase 1a line began in 2019, and it opened to passengers in 2023.

In August 2025, a public consultation was launched for an additional extension serving the north–south axis of the city. This could link Granton in the north via either the Roseburn Path to Murrayfield or via Orchard Brae and Dean Bridge to the west end of Princes Street. There are also proposals to run trams over North Bridge and South Bridge to Cameron Toll then along Old Dalkeith Road to the Royal Infirmary and BioQuarter. The cost is estimated at between £2bn and £2.9bn. This comprises sections of the original Lines 1 and 3.