Progress MS-33
Progress MS-33 docks with the Poisk module, with its Kurs docking antenna (white, centre) still stowed | |
| Names | Progress 94 ISS 94P |
|---|---|
| Mission type | ISS resupply |
| Operator | Roscosmos |
| COSPAR ID | 2026-058A |
| SATCAT no. | 68319 |
| Mission duration | 169 days, 6 hours and 27 minutes |
| Spacecraft properties | |
| Spacecraft | Progress MS-33 No. 463 |
| Spacecraft type | Progress MS |
| Manufacturer | Energia |
| Launch mass | 7,280 kg (16,050 lb) |
| Start of mission | |
| Launch date | 22 March 2026, 11:59:51 UTC |
| Rocket | Soyuz-2.1a |
| Launch site | Baikonur, Site 31/6 |
| Contractor | RKTs Progress |
| End of mission | |
| Disposal | Deorbited |
| Decay date | 7 September 2026, 18:27 UTC |
| Orbital parameters | |
| Reference system | Geocentric orbit |
| Regime | Low Earth orbit |
| Inclination | 51.65° |
| Docking with ISS | |
| Docking port | Poisk zenith |
| Docking date | 24 March 2026, 13:40:47 UTC |
| Undocking date | 7 September 2026, 15:18 UTC |
| Time docked | 167 days, 1 hour and 37 minutes |
| Cargo | |
| Mass | 2,509 kg (5,531 lb) |
| Pressurised | 1,211 kg (2,670 lb) |
| Fuel | 828 kg (1,825 lb) |
| Gaseous | 50 kg (110 lb) |
| Water | 420 kg (930 lb) |
Progress MS-33 (Russian: Прогресс МC-33), Russian production No. 463, identified by NASA as Progress 94, was a Progress cargo spacecraft mission by Roscosmos to resupply the International Space Station (ISS). It is the 186th flight of a Progress spacecraft and was originally scheduled to launch in late 2025, but was delayed to 22 March 2026 due to damage at Baikonur Cosmodrome Site 31 following the launch of Soyuz MS-28.