Potters Bar Tunnel
| Potters Bar Tunnel | |
|---|---|
A train in the cutting between the Potters Bar Tunnel (L) and the Hadley Wood North Tunnel (R). The tunnel mouth of the former can be faintly made out on the very left. | |
Interactive map of Potters Bar Tunnel | |
| Overview | |
| Line | East Coast Main Line |
| Location | Potters Bar, Hertfordshire |
| Coordinates | 51°41′0″N 0°10′50″W / 51.68333°N 0.18056°W |
| Status | Operational |
| System | National Rail |
| Operation | |
| Constructed | First bore: 1850 Second bore: 1955–1959 |
| Owner | Network Rail |
| Operator | See East Coast Main Line § Operators |
| Technical | |
| Design engineer | Thomas Brassey |
| Length | 1,214 yd (1,110 m) |
| No. of tracks | 4 |
| Track gauge | 4 ft 8+1⁄2 in (1,435 mm) standard gauge |
| Electrified | 25 kV 50 Hz AC |
Operating speed | Fast tracks: Down, 115 mph (185 km/h); Up, 105 mph (169 km/h). Slow tracks: 75 mph (121 km/h) |
The Potters Bar Tunnel is a railway tunnel on the East Coast Main Line in the United Kingdom between Hadley Wood and Potters Bar railway stations; at 1,214 yards (1,110 metres) in length, it is the longest on the line. Its two parallel bores carry four tracks beneath high terrain and the M25 motorway. The lines tolerate speeds of 75 miles per hour (121 kilometres per hour) on the slow tracks and 105 mph (169 km/h) and 115 mph (185 km/h) on the fast tracks, with a continual gradient 1 in 200 (5‰), which is uphill for trains heading away from London.
The first bore of the tunnel was finished in time for the opening of the line in August 1850. Despite permission having been granted by Parliament in 1882, a second bore was not opened until 1959.