Pink Line (Pune Metro)

Pune Metro Line 3
A Pink Line driverless Alstom Metropolis rake at Hinjawadi Phase-I, captured during testing.
Overview
StatusUnder Construction
OwnerPune Metropolitan Region Development Authority (PMRDA)
Line number3
LocalePune Metropolitan Region
Termini
Stations23
Website
Service
TypeRapid Transit
SystemPune Metro
OperatorKeolis
Depot(s)Maan, Hinjawadi
Rolling stockAlstom Metropolis
History
Planned openingMaan–R K Laxman Museum Balewadi: December 2026 (2026-12)
Balewadi High Street–District Court Pune: March 2027 (2027-03)
Technical
Line length23.3 km (14.5 mi)
Number of tracks2
CharacterGrade separated, Elevated
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
Electrification750V DC Third rail
Operating speed34 km/h (21 mph)
SignallingCBTC
Route map

Hinjawadi Depot
Megapolis Circle
Quadron
Infosys Phase II
Dohler
Wipro Technologies
Pall India
Shivaji Chowk
Hinjawadi
Wakad Chowk
Balewadi Stadium
NICMAR
Ramnagar (Pune)
Laxmi Nagar (Pune)
Balewadi Phata
Baner Gaon
Baner
Indian Agricultural Research Institute
Sakal Nagar
Savitribai Phule Pune University
Reserve Bank of India
Agriculture College
Shivaji Nagar Bus interchangeMainline rail interchange
District Court Pune

Pune Metro Pink Line of the Pune Metro is the third line of the city of Pune's under-construction mass transit network. It will run from District Court, Pune to Megapolis Pune in Hinjawadi. The 23.3 km (14.5 mi) line will be completely elevated and will have 23 stations and will align with the Maharashtra Metro Rail Corporation Limited (Maha Metro) lines at the District Court interchange station. The construction will be taken up in two phases, the section between Hinjawadi and Balewadi is expected to be taken up first, followed by the section between Balewadi and District Court, Shivajinagar. A metro car shed will be built in Hinjawadi. The MIDC will provide 55 acres of land in Hinjawadi for setting up a Metro rail depot. On 3 August 2018, Pune Metropolitan Region Development Authority (PMRDA) announced the final bidder for the project — the joint venture Tata Realty-Siemens. Pune IT City Metro Rail Limited On 3 October 2018, Tata Realty-Siemens were awarded the contract to execute the project on a design, build, finance, operate and transfer model. The formal concession agreement was signed in September 2019 with the construction expected to begin in March 2020.