Pine Tier Dam
| Pine Tier Dam | |
|---|---|
Pine Tier Dam Location of the dam in Tasmania | |
Interactive map of Pine Tier Dam | |
| Country | Australia |
| Location | Queenstown, Central Highlands, Tasmania |
| Coordinates | 42°06′00″S 146°29′13″E / 42.099958°S 146.486893°E |
| Purpose | Power |
| Status | Operational |
| Opening date | 2 June 1953 |
| Built by | Macmahon Constructions |
| Owner | Hydro Tasmania |
| Dam and spillways | |
| Type of dam | Gravity dam |
| Impounds |
|
| Height (foundation) | 44 m (144 ft) |
| Length | 195 m (640 ft) |
| Dam volume | 77×103 m3 (2.7×106 cu ft) |
| Spillway length | Uncontrolled |
| Spillway capacity | 2,432 m3/s (85,900 cu ft/s) |
| Reservoir | |
| Creates | Pine Tier Lagoon |
| Total capacity | 7,420 ML (6,020 acre⋅ft) |
| Catchment area | 736 km2 (284 sq mi) |
| Surface area | 83 ha (210 acres) |
| Normal elevation | 658 m (2,159 ft) AHD |
| Tungatinah Power Station | |
| Coordinates | 42°17′49″S 146°27′24″E / 42.29694°S 146.45667°E |
| Operator | Hydro Tasmania |
| Commission date | 1953 – 1956 |
| Type | Conventional |
| Turbines |
|
| Installed capacity | 125 MW (168×103 hp) |
| Capacity factor | 0.8 |
| Annual generation | 579 GWh (2,080 TJ) |
The Pine Tier Dam is a gravity dam across the confluence of the Nive and Pine rivers, located near Queenstown, in the Central Highlands region of Tasmania, Australia. Completed in 1953, the resultant reservoir, the Pine Tier Lagoon, was established for the purpose of generating hydroelectricity.
The Pine Tier Dam and its reservoir are one of several dams and reservoirs that supply water to the Tungatinah Power Station, a conventional hydroelectric power station. The dam, reservoir and power station are owned and operated by Hydro Tasmania.