Penychain railway station
Penychain station in 2014 | |||||
| General information | |||||
| Location | near Chwilog, Gwynedd Wales | ||||
| Coordinates | 52°54′11″N 4°20′20″W / 52.903°N 4.339°W | ||||
| Grid reference | SH428364 | ||||
| Manager | Transport for Wales | ||||
| Platforms | 1 | ||||
| Other information | |||||
| Station code | PNC | ||||
| Classification | DfT category F2 | ||||
| Key dates | |||||
| 31 July 1933 | Opened (as Penychain Halt) | ||||
| Passengers | |||||
| 2020/21 | |||||
| 2021/22 | |||||
| 2022/23 | |||||
| 2023/24 | |||||
| 2024/25 | |||||
| |||||
| |||||
Penychain railway station, is located by an over bridge at Pen-ychain on the Llŷn Peninsula in Gwynedd, Wales. For many years the station served the large Butlins Holiday Camp at Penychain. The station is on the Cambrian Line, between Abererch and Criccieth, 129 miles 29 chains (208.2 km) from Whitchurch, measured via Oswestry (the original line diverging at Welshpool).