Patna Metro

Patna Metro
Overview
OwnerPatna Metro Rail Corporation Limited (PMRCL)
LocalePatna, Bihar, India
Transit typeRapid transit
Number of lines
2
Line numberOperational
Blue Line
Under construction
Red Line
Number of stations
5
HeadquartersIndira Bhawan, Boring Canal Road, Patna
Websitepatnametro.bihar.gov.in
Operation
Began operation
6 October 2025 (2025-10-06)
OperatorsDelhi Metro Rail Corporation (DMRC)
Patna Metro Rail Corporation (PMRC)
Headway20 minutes
Technical
System length6.2 km (3.9 mi) (operational)
No. of tracks2
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
Electrification25 kV 50 Hz AC overhead catenary
Average speed30 km/h (19 mph)
Top speed80 km/h (50 mph)
System map

Patna Metro (Patna MRTS) is a rapid transit system constructed in the city of Patna, India. Construction will be completed over five phases, and the transit system would be owned and operated by the state-run Patna Metro Rail Corporation. In the first phase, five stations of Patna Metro is operational on 6th October 2025. Patna MRTS, constructed under a public-private partnership model, is estimated to cost ₹13,365.77 crore (US$1.4 billion). This cost excludes land acquisition cost, which will be paid for by the Bihar government. The first phase (consisting of the east–west and north–south corridors) will include both a 15.36 km (9.54 mi) elevated track and a 16.30 km (10.13 mi) underground track.

In January 2022, Larsen & Toubro (L&T) secured the order from metro operator Delhi Metro Rail Corporation (DMRC) for the design and construction of the Corridor-2 of Phase-1 of Patna Metro. L&T classifies this contract, worth ₹1,989 crore (US$210 million), as a significant order. The major scope of work for the project comprises six underground metro stations: Rajendra Nagar, Moin-Ul-Haq Stadium, Patna Science College, Patna Medical College and Hospital, Gandhi Maidan and Akashvani of Corridor-2.