Orleans Arena

Orleans Arena
Orleans Arena (2019)
Orleans Arena is located in Nevada
Orleans Arena
Orleans Arena
Location in Nevada
Orleans Arena is located in the United States
Orleans Arena
Orleans Arena
Location in the United States
Orleans Arena is located in North America
Orleans Arena
Orleans Arena
Location in North America
Interactive map of Orleans Arena
Address4500 West Tropicana Avenue
LocationParadise, Nevada, U.S.
Coordinates36°6′21″N 115°12′8″W / 36.10583°N 115.20222°W / 36.10583; -115.20222
OwnerBoyd Gaming
OperatorBoyd Gaming
CapacityBoxing: 9,500
Concert: 8,921
Ice hockey: 7,773
Basketball: 7,471
Rodeo: 5,736
Tennis: 5,000
SurfaceMulti-surface
Construction
GroundbreakingFebruary 5, 2002 (2002-02-05)
OpenedMay 25, 2003 (2003-05-25)
Cost$85 million
ArchitectsSink Combs Dethlefs
Klai Juba
Structural engineers
John A. Martin & Associates
Services engineer
JBA Consulting Engineers
General contractor
Tiberti Construction
Tenants
Las Vegas Wranglers (ECHL) (2003–2014)
Las Vegas Gladiators (AFL) (2007)
Las Vegas Sin (LFL) (2011–2013)
Las Vegas Legends (MASL) (2012–2016)
Vegas Rollers (WTT) (2019)
Henderson Silver Knights (AHL) (2021–2022)
Las Vegas Rockers (IAL) (2026–present)
Website
www.orleansarena.com

Orleans Arena is a 9,500-seat multi-purpose arena in Paradise, Nevada, in the Las Vegas Valley. It is located at the Orleans Hotel and Casino and is operated by Coast Casinos, a subsidiary of Boyd Gaming Corporation.

The arena is the home to the Vegas Rollers of World TeamTennis since 2019. It is also an occasional home for the UNLV Rebels basketball team when the Thomas & Mack Center is in use. The arena was the home of the Las Vegas Wranglers ice hockey team from 2003 to 2014, the Las Vegas Gladiators arena football team in 2007, as well as the Las Vegas Sin women's football team.

In 2020, the Vegas Golden Knights announced it was purchasing and relocating an American Hockey League (AHL) franchise. The Henderson Silver Knights played two seasons at Orleans Arena until the club's new 6,000-seat arena was completed in Henderson, Nevada in March 2022.