Offshore wind power in the United States
Offshore wind power in the United States is in the early stages of development and shifting public opinion. In 2022, the National Renewable Energy Laboratory (NREL) estimated that the country has a "technical" resource potential of 1,476 GW (fixed-bottom) and 2,773 GW (floating) offshore wind power. Offshore wind projects are currently being developed along the East Coast, in the Great Lakes, and on the Pacific Coast, with a focus on areas with high wind potential.
The first operational offshore wind farm in the U.S., Block Island Wind Farm, became operational in 2016. The first commercial-scale offshore wind farm (greater than 100 MW), South Fork Wind (132 MW), began operation in federal waters off the coast of Rhode Island in 2024, with full commissioning on March 14, 2024. As of March 6, 2025, the total installed offshore wind capacity in the U.S. was 174 MW. Power from the first turbine of Vineyard Wind 1 started flowing into the New England grid in January 2024. Construction of the wind farm was completed when the final wind turbine blades were installed on March 13, 2026.
Construction was paused in late December 2025 due to a Trump administration order to pause all offshore wind leases to review "national security risks". A preliminary court injunction in January 2026 allowed construction to resume while the lawsuit proceeded.