Northeast Maglev
| Northeast Maglev | |
|---|---|
| Overview | |
| Status | Proposed |
| Owner | Northeast Maglev, LLC |
| Locale | Northeastern United States |
| Termini | |
| Stations | 8 |
| Website | www |
| Service | |
| Type | High-speed rail |
| Rolling stock | L0 Series |
| History | |
| Planned opening | 2030 |
| Technical | |
| Operating speed | 314 mph (505 km/h) |
Northeast Maglev is a proposed maglev train system in the Northeastern United States. A private U.S. company, The Northeast Maglev, LLC, was established to promote the idea, and ultimately build the line, using the SCMaglev superconducting maglev system developed by the Central Japan Railway Company (JR Central) to provide 70-minute service between New York City and Washington, D.C., with intermediate stops at Baltimore-Washington International (BWI) Airport and Baltimore, and ultimately connecting major metropolitan hubs and airports across the Northeast.
On August 1, 2025, the Trump administration halted its review of the project, placing it on indefinite hold and possibly killing it.