North Shore Connector

North Shore Connector Tunnel
Interactive map of North Shore Connector Tunnel
Overview
Line
LocationPittsburgh
Coordinates40°26′41″N 80°00′22″W / 40.4446°N 80.006°W / 40.4446; -80.006
SystemPittsburgh Light Rail
CrossesAllegheny River
Operation
Work beganJanuary 2008 (2008-01)
OpenedMarch 25, 2012 (2012-03-25)
OperatorPort Authority of Allegheny County
Technical
Length2,240 ft (680 m)
Line length1.2 mi (1.9 km)
No. of tracks2
Track gauge5 ft 2+1⁄2 in (1,588 mm) Pennsylvania trolley gauge
Allegheny station and North Side station were newly constructed as part of the North Shore Connector project, while Gateway station was completely reconstructed.

The North Shore Connector is a light rail extension that opened in 2012 in Pittsburgh, Pennsylvania. The connector extends the Pittsburgh Light Rail system from its previous terminus at Gateway station in downtown to the new North Side and Allegheny stations on the North Shore by way of a tunnel under the Allegheny River. The Connector extends the light rail system's "Free Fare Zone", enabling passengers to ride to and from Pittsburgh's rapidly growing North Shore neighborhood for free.

Planned since the late 1990s, the North Shore Connector received federal funding on February 6, 2004 and had crews complete the initial bore under the river on July 10, 2008. The Connector had a "soft opening" on Friday, March 23, 2012, with regular service beginning March 25, 2012. The final cost of the project was $523.4 million.