North Sea Link
| North Sea Link | |
|---|---|
| Location | |
| Country | Norway, United Kingdom |
| General direction | northeast–southwest |
| From | Kvilldal, Norway |
| Passes through | North Sea |
| To | Blyth, England |
| Ownership information | |
| Partners | Statnett National Grid plc |
| Construction information | |
Cable manufacturer | Prysmian (offshore section) Nexans (onshore section) |
| Cable layer | C/S Giulio Verne C/S Nexans Skagerrak |
Substation manufacturer | ABB |
Substation installer | ABB |
| Commissioned | 1 October 2021 |
| Technical information | |
| Type | submarine cable |
| Current type | HVDC |
| Total length | 720 km (450 mi) |
| Capacity | 1,400 MW |
| DC voltage | ±515 kV |
| No. of poles | 2 (bipole) |
| No. of circuits | 1 |
The North Sea Link is a 1,400 MW high-voltage direct current submarine power cable between Norway and the United Kingdom.
At 720 km (450 mi), it was the longest subsea interconnector in the world when it became operational on 1 October 2021.