North East Link

North East Link

Interactive map showing the main route of the North East Link, connecting the M80 Ring Road (north end) to the Eastern Freeway (south end).
General information
TypeFreeway  (Under construction)
Length10 km (6.2 mi)
OpenedLate 2028 (scheduled)
Major junctions
North end Metropolitan Ring Road
Greensborough, Melbourne
 
South end Eastern Freeway
Bulleen, Melbourne
Highway system
----
  • Infobox instructions
  • guidelines
  • examples
  • talk
Watsonia facing north, with the Northeast Link Big Build in 2025
North East Link where Greensborough meets the M80
The North East Link works around Yarra Flats Park, April 2024.
The Yarra Flats, North East Link build and the Melbourne skyline, April 2024.
North East Link works next to Banksia Park and Manningham Road, July 2024.
North East Link tunneling work near Watsonia Station on Greensborough Road, Watsonia.
Northeast link at Viewbank facing the Melbourne skyline. October 2024.
Bulleen aerial panorama with the North East Link Build
Closeup of the North East Link build in Bulleen
North East Link section at Greensborough and near the Hurstbridge Line facing the Melbourne skyline

The North East Link is an under-construction 10–kilometre tolled highway scheme in Melbourne, Australia. It will connect the Metropolitan Ring Road at Greensborough with the Eastern Freeway at Bulleen, which will be upgraded from Hoddle Street to Springvale Road at Nunawading.

Other components of the project include the construction of a new dedicated busway along the Eastern Freeway to serve the Doncaster area, and park and ride car parking facilities. The Eastern Freeway will be widened from nine lanes to 20 in some parts.

In December 2016, Victorian Premier Daniel Andrews announced that a re-elected Labor government would build the North East Link at a cost of $10 billion. Early works began in 2020 and tunnelling commenced in mid 2024, with an expected completion in late 2028.

In 2021, the length of the tunnelled portion was increased by 1.9 km to 6.5 km, and the cost of the main construction contract, to be delivered through a public-private partnership, rose to $11.1 billion. The overall long-term budget for the project was set at $16.5 billion in 2017, but this increased to $26.1 billion as of 2023.