Shachi-class patrol vessel (2026)

Shachi class design
Class overview
Builders
Operators Indian Navy
Preceded by
Cost
  • ₹9,781 crore (US$1.0 billion)
  • ₹889.18 crore (US$92 million) per unit (FY 2023)
Built2024 – present
Planned11
Building8
Completed3
Active0
General characteristics
TypeOffshore patrol vessel
Displacement3,000 t (2,953 long tons)
Length113 m (370 ft 9 in)
Beam14.6 m (47 ft 11 in)
Draught4–5 m (13 ft 1 in – 16 ft 5 in)
Propulsion2 × diesel engine
Speed25 knots (46 km/h; 29 mph)
Range8,500 nmi (15,700 km; 9,800 mi) at 14 knots (26 km/h; 16 mph) with 25% reserve fuel
Endurance60 days (minimum)
Complement20 officers including 4 women officers and 130 sailors
Sensors &
processing systems
Electronic warfare
& decoys
Armament
Aircraft carried1 × 15 t (15 long tons) helicopter with facility for UAVs
Aviation facilities
  • Helipad with enclosed hangar (1 × multi-role helicopter or UAVs)
  • Storage for Light Weight Torpedoes Shyena for helicopter.

The Shachi-class offshore patrol vessels are large patrol crafts being built at the Goa Shipyard Limited (GSL) and Garden Reach Shipbuilders & Engineers (GRSE) for the Indian Navy. The deal was signed on 30 March 2023 with the delivery of the ships scheduled to commence from September 2026. The primary role of the vessels to maintain the Indian Navy's combat capability and meet various operational requirements such as anti piracy, counter-infiltration, anti poaching, anti trafficking, non combatant evacuation operations, Search and Rescue (SAR), protection of offshore assets and mine warfare.