Nashira (AK-85)
Sister ship USAPRS Thomas F. Farrel, Jr. underway off the East Coast of the United States, 26 August 1944. US National Archives photo # 80-G-420158 RG-80-G, a US Navy photo now in the collections of the US National Archives. | |
| History | |
|---|---|
| Name |
|
| Ordered | as Josiah Paul, transferred to Navy for construction as Nashira |
| Builder | Penn-Jersey Shipbuilding Company, Camden, New Jersey |
| Laid down | 1 November 1943 |
| Launched | 23 April 1944 |
| Acquired | 25 April 1944 (delivered to Navy/transferred to Army) |
| Commissioned | Never commissioned |
| In service | 1944-1947 (U.S. Army) |
| Out of service | 1947 |
| Renamed |
|
| Stricken | 9 June 1944 |
| Fate | Sold March 1965 to Kelbar, Inc. for scrap |
| General characteristics | |
| Class & type | Navy: Enceladus-class cargo ship |
| Type | N3–M–A1 cargo ship |
| Displacement |
|
| Length | 269 ft 10 in (82.25 m) |
| Beam | 42 ft 6 in (12.95 m) |
| Draft | 20 ft 9 in (6.32 m) |
| Propulsion | Diesel, single shaft, 1,300 shp (969 kW) |
| Speed | 10 knots (19 km/h; 12 mph) |
| Notes | The ship was Navy only during construction, transferred to Army upon delivery to Navy and underwent extensive modifications for operation by the Corps of Engineers as a port repair ship. |
Nashira (AK-85) was planned as a civilian cargo ship for the United States Maritime Commission, transferred to the Navy for construction then transferred to the U.S. Army and renamed two days after launching. The ship was never commissioned, thus never bore the USS designation, and had no significant naval service. The ship was converted to the U.S. Army Engineer Port Repair ship Richard R. Arnold and served in the Pacific during 1945.