Mutiara Line

LRT Mutiara Line
Overview
Native nameLaluan Mutiara
StatusUnder construction
(8.99% as of June 2026)
OwnerMalaysia Rapid Transit Corporation
LocalePenang
Coordinates5°19′58″N 100°17′43″E / 5.3326677°N 100.2952707°E / 5.3326677; 100.2952707
Termini
Stations20 and 2 provisional
Websitelaluanmutiara.mymrt.com.my
Service
TypeLight rapid transit
Depot(s)Silicon Island
Sungai Nibong
History
Work began11 January 2025 (2025-01-11)
Planned openingDecember 2031 (2031-12)
Technical
Line length29.5 km (18.3 mi)
CharacterElevated
Electrification750 V DC
Operating speed70 km/h (43 mph)
Route map

Depot
A01
PSR-A
S02
Permatang Damar Laut Parking
S03
Penang International Airport
Penang International Airport
S04
Sungai Tiram
S05
FIZ South
S06
FIZ North
S07
Jalan Tengah Parking
S08
SPICE
S09
Bukit Jambul Parking
S10
Sungai Nibong
 Depot
S11
Sungai Dua Parking
Sungai Nibong Bus Terminal
S12
Batu Uban
S13
Jalan Universiti Parking
S14
Gelugor Parking
S15
Penang Waterfront
S16
East Jelutong
S17
Sungai Pinang Parking
Penang Skycab
S18
Bandar Sri Pinang Parking
S19
Macallum
S20
Komtar
 TTL  Ayer Itam monorail line Georgetown tram line
S30
Jalan Bagan Luar
S31
Penang Sentral Parking
Penang ferry service
Keretapi Tanah Melayu Butterworth
 ETS   1   2 

The LRT Mutiara Line (English: Pearl) is a light rapid transit (LRT) system under construction in Penang. The 29.5 km (18.3 mi) line will connect George Town's city centre with its southern suburbs of Jelutong, Gelugor and Bayan Lepas, with a link towards Seberang Perai across the Penang Strait. The first domestic LRT line outside the Klang Valley, the Mutiara Line is a component of the Penang Transport Master Plan (PTMP) and comprises 22 stations. Once completed, it will be owned by the Malaysia Rapid Transit Corporation (MRT Corp). Construction of the line began in 2025 and it is planned to be completed by December 2031.

An LRT or rapid transit system has been proposed for Penang for decades, with early plans dating back to 1981. However, the project faced prolonged delays due to political disputes between rival coalitions. Over the years, proposals shifted between heavy rail, heritage trams and a monorail system. The monorail, proposed in 2002, was ultimately scrapped in 2008 following the Barisan Nasional (BN) government's defeat in the state election that year. The current project was introduced by the Penang state government, under Pakatan Rakyat (PR), in 2015 as the "Bayan Lepas line" under the PTMP. The plan envisioned a light metro system operating along a north-south axis across George Town's heavily urbanised eastern shoreline, with a planned extension toward Silicon Island.

The project received conditional approval from the Malaysian federal government in 2019, and construction was scheduled to begin in 2020. However, the project faced successive delays due to the COVID-19 pandemic and the nationwide political crisis, which led to a withdrawal of support by alternating ruling coalitions before the federal government eventually intervened. Following the 2022 general election, the federal government, which now included Pakatan Harapan (PH) members, the successors of PR, expedited development by providing additional funding before fully taking over the project from the Penang state government. The line was subsequently re-designated and its alignment substantially redesigned, introducing a cross-strait link from George Town to Seberang Perai on the mainland.