Mount Emerald Wind Farm
| Mount Emerald Wind Farm | |
|---|---|
| Country | Australia |
| Coordinates | 17°11′S 145°22′E / 17.183°S 145.367°E |
| Status | Operational |
| Construction began | 14 February 2017 |
| Commission date | August 2018 |
| Construction cost | $400 million |
| Owner | |
| Operator | RATCH-Australia |
| Wind farm | |
| Type | Onshore |
| Hub height | 84 m (276 ft) Vestas V112 90 m (295 ft) Vestas V117 |
| Rotor diameter | 112 m (367 ft) 117 m (384 ft) |
| Rated wind speed | 50 km/h (13.9 m/s) |
| Site area | 2,400 ha (24 km2) |
| Site elevation | 900 m (2,953 ft) |
| Power generation | |
| Units operational | 16 × 3.3 MW 37 × 3.45 MW |
| Make and model | Vestas V112-3.3MW Vestas V117-3.45MW |
| Nameplate capacity | 180.5 MW |
| Annual net output | 500-600 GWh |
| External links | |
| Website | mtemeraldwindfarm |
Mount Emerald Wind Farm is a 180 MW wind farm situated on Mount Emerald, in Arriga, Shire of Mareeba, Queensland, Australia. It is approximately 8 km WNW of Tolga, and 49 km SW of Cairns. The project is a joint venture between Port Bajool (land owner) and RATCH-Australia (wind farm developer and operator). RATCH-Australia bought the project from Transfield Services in July 2011. The wind farm incorporates 53 turbines.