Moralane

Moralane
Water tank and pumping station
Moralane is located in Botswana
Moralane
Moralane
Location within Botswana
Coordinates: 22°04′29″S 27°38′34″E / 22.074783°S 27.642843°E / -22.074783; 27.642843
CountryBotswana
DistrictCentral District
Preview warning: Page using Template:Infobox settlement with deprecated parameter pushpin_map_caption. Replace with pushpin_caption.
Preview warning: Page using Template:Infobox settlement with deprecated parameter pushpin_map_alt. Replace with pushpin_alt.
Preview warning: Page using Template:Infobox settlement with deprecated parameter image_alt. Replace with alt.
Preview warning: Page using Template:Infobox settlement with deprecated parameter image_caption. Replace with caption.
Preview warning: Page using Template:Infobox settlement with deprecated parameter settlement_type. Replace with type.
Preview warning: Page using Template:Infobox settlement with deprecated parameter timezone1. Replace with time_zone1.
Preview warning: Page using Template:Infobox settlement with deprecated parameter image_skyline. Replace with image.
Preview warning: Page using Template:Infobox settlement with deprecated parameter timezone1_DST. Replace with time_zone1_DST.

Moralane is a key site on the North-South Carrier (NSC), in Botswana, the main pipeline delivering raw water from the northeast to the Mmamashia water treatment plant just north of Gaborone.

Phase 1 of the NSC opened in 2000, delivering water from the Letsibogo Dam on the Motloutse River. A reinforced concrete break pressure tank (BPT1) and a pumping station (PS2.1) were installed at Moralane in this phase. The break pressure tank has the capacity of 4,500 cubic metres (160,000 cu ft) and the pumping station has the capacity of 1.51 cubic metres (53 cu ft) per second.

Phase 2 of the NSC is due to start delivering water from the Dikgatlhong Dam on the Shashe River in 2014. The new pipeline from the Dikgatlhong Dam runs parallel to the existing pipeline along the section from the Letsibogo Dam to Moralane, causing concerns that blasting for the new pipeline may cause problems with the existing pipeline. The pumping equipment at Moralane will be upgraded by introduction of a variable speed drive. Initially, the water from both dams will be delivered through the same pipeline from Moralane south to Palapye.

An extension of the NSC is being considered to carry the Zambezi's water from Pandamatenga via Francistown to BPT1 at Moralane. A pre-feasibility study was delivered to the Department of Water Affairs in April 2010. This expansion would deliver another 100,000,000 cubic metres (3.5×109 cu ft) of water annually through the Moralane plant.