Meadowbank Dam
| Meadowbank Dam | |
|---|---|
The power station in 2010 | |
Meadowbank Dam Location of the dam in Tasmania | |
Interactive map of Meadowbank Dam | |
| Country | Australia |
| Location | Central Highlands, Tasmania |
| Coordinates | 42°36′40″S 146°50′42″E / 42.611175°S 146.844968°E |
| Purpose | Power |
| Status | Operational |
| Opening date | 1966 |
| Owner | Hydro Tasmania |
| Dam and spillways | |
| Type of dam | |
| Impounds | River Derwent |
| Height | 43 m (141 ft) |
| Length | 265 m (869 ft) |
| Dam volume | 86×103 m3 (3.0×106 cu ft) |
| Spillways | 1 |
| Spillway type | Controlled |
| Spillway capacity | 5,239 m3/s (185,000 cu ft/s) |
| Reservoir | |
| Creates | Meadowbank Lake |
| Total capacity | 60,000 ML (49,000 acre⋅ft) |
| Active capacity | 59,650 ML (48,360 acre⋅ft) |
| Catchment area | 6,561 km2 (2,533 sq mi) |
| Surface area | 600 ha (1,500 acres) |
| Normal elevation | 59 m (194 ft) AHD |
| Meadowbank Power Station | |
| Coordinates | 42°36′36″S 146°50′24″E / 42.61000°S 146.84000°E |
| Operator | Hydro Tasmania |
| Commission date | 1967 |
| Type | Run-of-the-river |
| Hydraulic head | 26 m (85 ft) |
| Turbines | 1 x 41.8 MW (56,100 hp) Andritz Kaplan-type |
| Installed capacity | 43.8 MW (58,700 hp) |
| Capacity factor | 0.51 |
| Annual generation | 187 GWh (670 TJ) |
| Website hydro.com.au | |
The Meadowbank Dam is a buttress dam, with a concrete-faced embankment, across the Lower River Derwent, located in the Central Highlands region of Tasmania, Australia. Completed in 1966 and owned and operated by Hydro Tasmania, the resultant reservoir was established for the purpose of generation of hydroelectricity via the Meadowbank Power Station, a run-of-the-river hydroelectric power station.