Mass Rapid Transit Master Plan in Bangkok Metropolitan Region

Bangkok Mass Rapid Transit System


Overview
OwnerBMA
MRTA
SRT
LocaleBangkok Metropolitan Region
Transit typeCommuter rail
•  SRT 
•  SRT 
Airport rail link
•  ARL 
Rapid transit
•  BTS 
•  BTS 
•  MRT 
•  MRT  (under expansion)
•  MRT  (under construction)
Light rail
• Silver Line (planned)
Monorail
•  MRT 
•  MRT  (planned)
•  MRT 
•  MRL  (planned)
•  MRL  (planned)
People Mover
•  BTS 
Number of lines
10 lines (out of 15 total planned)
Number of stations
193 out of planned 310
Daily ridership
1,408,431 (2024)
Annual ridership
515,485,410 (2024)
Operation
Began operation
5 December 1999
OperatorsS.R.T. Electrified Train
•  SRT 
•  SRT 
Asia Era One
•  ARL 
Bangkok Mass Transit System
•  BTS 
•  BTS 
•  MRT 
•  MRT 
•  BTS 
Bangkok Expressway and Metro
•  MRT 
•  MRT 
•  MRT 
Technical
System length279.64 km (174 mi)
Track gaugeMRT, BTS and Airport Rail Link: 1,435 mm (4 ft 8+1⁄2 in) standard gauge
SRT Red Lines: 1,000 mm (3 ft 3+3⁄8 in) metre gauge
ElectrificationMRT and BTS: 750 V DC third rail
ARL and SRT: 25 kV 50 Hz AC overhead catenary
Top speedMRT and BTS: 80 km/h (50 mph)
ARL and SRT: 160 km/h (99 mph)

The Mass Rapid Transit Master Plan in Bangkok Metropolitan Region, or M-Map, is the latest version in a series of Thai government plans for the development of an urban rail transit network serving the Greater Bangkok area. It was drafted under the care of the Office of Transport and Traffic Policy and Planning (OTP) of the Ministry of Transport.