Marine Facade

Sea Facade (reclaimed land)
Russian: Морской фасад
Намыв
Morskoi Fasad
Reclaimed land
Marine Facade
Sea Facade
Sea Facade
Sea Facade (reclaimed land)
Location within Saint Petersburg
Sea Facade
Sea Facade
Sea Facade (reclaimed land)
Location within Russia
Coordinates: 59°56′32″N 30°10′57″E / 59.94222°N 30.18250°E / 59.94222; 30.18250
CountryRussia
Federal citySaint Petersburg
The decision was made on development of the western part of Vasilievsky Island.July 1, 2004
Marine Facade Management Company began.October 25, 2006
Project of a lay-out of territory of the Neva Bay in the Gulf of Finland off the west coast of Vasilievsky Island was confirmed.November 13, 2007
Area
 • Total
4.767 km2 (1.841 sq mi)
"Marine Facade Management Company official site". Marine Facade Management Company. Retrieved 2010-12-19.
Preview warning: Page using Template:Infobox settlement with deprecated parameter settlement_type. Replace with type.
Preview warning: Page using Template:Infobox settlement with deprecated parameter timezone1_DST. Replace with time_zone1_DST.
Preview warning: Page using Template:Infobox settlement with deprecated parameter timezone1. Replace with time_zone1.
Preview warning: Page using Template:Infobox settlement with deprecated parameter image_caption. Replace with caption.
Preview warning: Page using Template:Infobox settlement with deprecated parameter pushpin_map_alt. Replace with pushpin_alt.
Preview warning: Page using Template:Infobox settlement with deprecated parameter image_skyline. Replace with image.

The Sea (Marine) Facade is a project of expansion of St. Petersburg, on Vasilievsky Island at the Neva river's mouth. In these new territories, the Passenger Port of St. Petersburg was created, along with a considerable amount of residential and commercial space. The Western Rapid Diameter highway was built across these lands.

This project was implemented within the framework of a public-private partnership between the Saint Petersburg City Administration and the Marine Facade Management Company. The primary goal of this project was to build the Passenger Port of St. Petersburg by reclaiming new territories of 476 hectares from the Neva Bay in the Gulf of Finland. The total cost of the project is an estimated 3 billion dollars.

The project built over 1.5 million square metres of office space, 3 million square metres of residential space, as well as retail, entertainment and social facilities, two subway stations, and a marina.

In 2008, the first phase of work was finished, and an area of 150 hectares was reclaimed for the port building. Reclamation of an additional 20 hectares for the Western Rapid Diameter and the construction of buildings subsequently began.