Malta–Gozo Tunnel
| Malta–Gozo Tunnel | |
|---|---|
| Overview | |
| Location | Nadur (Gozo) and Manikata (Malta) |
| Operation | |
| Work began | suspended without a deadline, plans shelved |
| Traffic | Automobile and public transport vehicles |
| Vehicles per day | 6,500 (predicted) |
| Technical | |
| Length | 13 km (8.1 mi) |
| No. of lanes | 2 lanes (1 each way with an additional emergency lane) |
| Width | 3.25–3.50 m (10.7–11.5 ft) (projected) |
| Route map | |
The Malta–Gozo Tunnel was a planned undersea tunnel between the islands of Malta and Gozo, both part of the Republic of Malta. The tunnel would have replaced the Gozo Channel Line, the current inter-island ferry service, between Ċirkewwa in Malta and Mġarr in Gozo.
In October 2022, plans were shelved.