MRT Line 7 (Metro Manila)

MRT Line 7
Hyundai Rotem trains in 2021
Overview
StatusUnder construction
OwnerDepartment of Transportation
Line number7
LocaleMetro Manila and Bulacan, Philippines
Termini
Stations14
Service
TypeRapid transit
SystemManila Metro Rail Transit System
Services1
OperatorSMC Mass Rail Transit 7 Incorporated
Rolling stockClass 000 EMUs
Daily ridership300,000 (initial)
850,000 (design capacity)
History
Work beganAugust 15, 2017 (2017-08-15)
Planned openingQ2 2027 (North EDSA to Sacred Heart)

2028 (Tala to San Jose del Monte
Technical
Line length24.069 km (14.956 mi)
Number of tracksDouble-track
CharacterGrade separated
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
Electrification750 V DC third rail
Average inter-station distance1.85 km (1.15 mi)
Route map

San Jose Del Monte
Tala
Depot
Sacred Heart
Quirino
Mindanao Avenue
Regalado Avenue
Doña Carmen
Manggahan
Batasan
Don Antonio
Tandang Sora
University Avenue
Quezon Memorial Circle
North EDSA
 MMS 

Metro Rail Transit Line 7 (MRT-7), is an under-construction rapid transit line across Metro Manila in Philippines, with its phase-1 with 14-stations on 22.8 kilometers (14.2 mi) route from Bulacan (San Jose del Monte) in the northeast to Quezon City (North Triangle Common Station in North Avenue) in the southwest expected to become partially operational in 2027.

MRT-7 will be expanded to a 200-kilometer (120 mi) network in phases, including a main loop-line as an extension of the present line, as well as several other phased extensions such as the New Manila International Airport Link, the West Rail Link, Manila North Harbor-North Avenue Common Station Link, etc.