MI 09

MI 09
MI 09 trainset on the Nanterre viaduct
In service5 December 2011–present
ManufacturersAlstom and Bombardier
Family nameX'Trapolis
ReplacedMS 61
Constructed2010–2017
Entered service5 December 2011
Number in service140 trainsets (700 cars)
Formation5 cars per trainset
OperatorsRATP, SNCF
Depots
  • Achères
  • Rueil-Malmaison
  • Sucy-en-Brie
  • Torcy
Line servedRER RER A
Specifications
Car body constructionStainless steel
Car length22 m (72 ft 2 in)
Width2.9 m (9 ft 6 in)
Height4.32 m (14 ft 2 in)
Doors2 × 3 per car
Maximum speed120 km/h (75 mph)
Weight288,000 kg (634,931 lb)
Traction systemAlstom OniX CADIX IGBT–VVVF (liquid cooled)
Traction motors12 × 325 kW (436 hp) 4 ECA 2846 3-phase AC induction motor (550 V natural ventilation)
Power output3,900 kW (5,200 hp)
Acceleration1.1 m/s2 (3.6 ft/s2)
Deceleration
  • 1.15 m/s2 (3.8 ft/s2) (service)
  • 1.25 m/s2 (4.1 ft/s2) (emergency)
HVACRefrigerated HVAC and in-train heater
Electric systems
Current collectionPantograph (type AX 25)
UIC classification2′2′+Bo′Bo′+Bo′Bo′+Bo′Bo′+2′2′
Braking systemsDisc, dynamic and regenerative Eddy current brake
Safety systemSACEM
Coupling systemScharfenberg type
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge

The MI 09 (French: Matériel d'Interconnexion de 2009, lit. 'interconnection rolling stock of 2009') is a double-deck, dual-voltage electric multiple unit trainset operated on line A of the Réseau Express Régional (RER), a hybrid suburban commuter and rapid transit system serving Paris and its surrounding Île-de-France region.

A total of 140 five-car trainsets were built by a consortium of Alstom and Bombardier. Based on the earlier MI 2N series and part of Alstom's X'Trapolis Duplex platform, the MI 09 units were assembled at Alstom's factory in Valenciennes factory and Bombardier's facility in Crespin between 2010 and 2017. The first train entered service on 5 December 2011.

The MI 09 fleet replaced the older MS 61 rolling stock, which was retired in April 2016, and allowed the redeployment of MI 84 units to the RER B by early 2017.