M4 (Copenhagen Metro)

M4
M4 train leaving Orientkaj station
Overview
OwnerMetroselskabet
LocaleCopenhagen, Denmark
Termini
Stations13
Service
TypeRapid transit
SystemCopenhagen Metro
OperatorMetro Service
History
Opened28 March 2020 (28 March 2020)
Last extension22 June 2024 (22 June 2024)
Technical
Number of tracksDouble
CharacterUnderground
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
Electrification750 V DC third rail
Operating speed90 km/h (56 mph)
Route map
Nordsø Plads
Levantkaj
Orientkaj
Nordhavn
Østerport
Mainline rail interchange
Marmorkirken
Kongens Nytorv
Gammel Strand
Rådhuspladsen
København H
Mainline rail interchange
Havneholmen
Enghave Brygge
Sluseholmen
Mozarts Plads
København S
Mainline rail interchange

The M4 (the Harbour Line) of the Copenhagen Metro connects Nordhavn in the north with Sydhavn in the south. The central part of the line shares tracks with the City Circle Line (M3).

The Nordhavn branch was approved by the Danish Parliament in 2012 and was opened on 28 March 2020. The Sydhavn branch was approved in 2015 and opened on 22 June 2024. A further Nordhavn extension is planned with two new stations opening in 2030.

Both Nordhavn and Sydhavn are former industrial areas situated at opposite ends of the Port of Copenhagen and currently undergoing urban renewal under the auspices of By & Havn.

When the City Circle Line was planned, the M4 was intended to supplement the M3 from Nørrebro to København H providing increased metro capacity to the eastern section of the inner city. At this time, it was presumed that the M4 would eventually be expanded from Nørrebro to the northwestern suburbs, but this plan was abandoned in 2009, when the city of Copenhagen scrapped plans for an interchange facility under Nørrebro station. Instead, the city preferred a solution where the M4 would connect the Nordhavn and Sydhavn districts.