Lyublinsko-Dmitrovskaya line

Lyublinsko-Dmitrovskaya line
Overview
OwnerMoskovsky Metropoliten
LocaleMoscow
Termini
Stations26
Service
TypeRapid transit
SystemMoscow Metro
OperatorMoskovsky Metropoliten
Rolling stock81-717.5/714.5
81-717.5M/714.5M
81-717.6/714.6
History
Opened28 December 1995 (28 December 1995)
Last extension2023
Technical
Line length44.3 kilometres (27.5 mi)
CharacterUnderground
Track gauge1,520 mm (4 ft 11+27⁄32 in)
ElectrificationThird rail
Route map

Fiztekh
Lianozovo
#D1 Line D1 (Moscow Central Diameters)
Yakhromskaya
Seligerskaya
Verkhniye Likhobory
Likhobory yard
Okruzhnaya
Transfer for #14 Moscow Central Circle at Okruzhnaya Transfer for #D1 Line D1 (Moscow Central Diameters) at Okruzhnaya
Transfer for #9 Serpukhovsko-Timiryazevskaya line at Petrovsko-Razumovskaya via cross-platform interchange Ground transferTransfer for #D1 Line D1 (Moscow Central Diameters) at Petrovsko-Razumovskaya
Fonvizinskaya
Butyrskaya
Ground transferTransfer for #D3 Line D3 (Moscow Central Diameters) at Ostankino
Maryina Roshcha
Transfer for #11 Bolshaya Koltsevaya line at Maryina Roshcha
Dostoevskaya
(Transfer for #5 Koltsevaya line at Suvorovskaya)
Trubnaya
Transfer for #9 Serpukhovsko-Timiryazevskaya line at Tsvetnoy Bulvar
Sretensky Bulvar
Transfer for #1 Sokolnicheskaya line at Chistye Prudy Transfer for #6 Kaluzhsko-Rizhskaya line at Turgenevskaya
Chkalovskaya
Kursky railway station Transfer for #3 Arbatsko-Pokrovskaya line at Kurskaya Transfer for #5 Koltsevaya line at Kurskaya Transfer for #D2 Line D2 (Moscow Central Diameters) at Moscow KurskyTransfer for #D4 Line D4 (Moscow Central Diameters) at Moscow Kursky
Rimskaya
Transfer for #8 Kalininskaya line at Ploshchad Ilyicha Ground transferTransfer for #D2 Line D2 (Moscow Central Diameters) at Serp i MolotTransfer for #D4 Line D4 (Moscow Central Diameters) at Moskva-Tovarnaya
Krestyanskaya Zastava
Transfer for #7 Tagansko-Krasnopresnenskaya line at Proletarskaya
Dubrovka
Ground transferTransfer for #14 Moscow Central Circle at Dubrovka
Kozhukhovskaya
(Transfer for #16 Troitskaya line at Kozhukovskaya) Ground transferTransfer for #14 Moscow Central Circle at Dubrovka
Yuzhny Port
Pechatniki yard
Pechatniki
Transfer for #11 Bolshaya Koltsevaya line at Pechatniki Ground transferTransfer for #D2 Line D2 (Moscow Central Diameters) at Pechatniki
Volzhskaya
Lyublino
Bratislavskaya
Maryino
Borisovo
Shipilovskaya
Zyablikovo
Transfer for #2 Zamoskvoretskaya line at Krasnogvardeyskaya
to Alma-Atinskaya and Brateyevo yard

The Lyublinsko-Dmitrovskaya line (Russian: Любли́нско-Дми́тровская ли́ния, IPA: [lʲuˈblʲinskə ˈdmʲitrəfskəjə ˈlʲinʲɪjə]pronunciationⓘ) (Line 10; Lime Line) is a line of the Moscow Metro. The line first opened in 1995 as a radial stretch of rail connecting Chkalovskaya station in the center with Maryino station in the southeast and has been greatly expanded northwards since. Before 2007, it was known as "Lyublinskaya line" (Любли́нская ли́ния) by the name of the district of Lyublino that it passes through. As of 2024, the line has 44.3 kilometres (27.5 mi) of track and 26 stations, making it the longest fully-underground line in the Moscow Metro and one of the longest tunnels in the world.