Line H (Buenos Aires Underground)


Line H
Overview
Termini
Stations12
Service
TypeRapid transit
SystemBuenos Aires Underground
OperatorEmova
Rolling stock300 series
Daily ridership60,547 (2024)
History
Opened18 October 2007 (2007-10-18)
Last extension2018
Technical
Line length8.8 km (5.5 mi)
CharacterUnderground
Track gauge1,435 mm (4 ft 8+1⁄2 in)
ElectrificationOverhead line, 1,500 V DC
Route map

Mitre Line
Terminal de Ómnibus
Bus interchange
Padre Mugica
↑ planned extension
 
Facultad de Derecho
Las Heras
Santa Fe
Córdoba
Corrientes
Once
Domingo Faustino Sarmiento Railway
Venezuela
Humberto I
Inclán
Caseros
Colonia Workshops
Parque Patricios
Shops
Hospitales
Sáenz
↑ planned extension
Belgrano Sur Line

Line H is a line of the Buenos Aires Underground. The first phase, between Plaza Once and Caseros, which opened on 18 October 2007, currently stretches over 8.8 km between Hospitales and Facultad de Derecho stations. It is the first entirely new line built in Buenos Aires since the opening of Line E on 20 June 1944.

Line H map

According to projections, the line will stretch a total of about 11.85 km and will run from between Retiro to Sáenz once the remaining sections are constructed. It connects the southern part of the city with the north, improving traffic flow to the centre of the city. It is also designed to serve as a transversal line and provide cross-connections across all radial lines, mainly under the axis of Jujuy and Pueyrredón avenues.