Line D (Prague Metro)

Line D
Construction of Line D (2025)
Overview
OwnerPrague Public Transit Company
LocalePrague, Czech Republic
Stations10 (planned)
Service
TypeRapid transit
SystemPrague Metro
History
Opened2032 (2032) (planned)
Technical
Line length10.6 km (6.6 mi)
Number of tracksDouble
CharacterUnderground and Overground
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
Route map
Line D
Náměstí Míru
Botič
Náměstí bratří Synků
Pankrác
Olbrachtova
Kunratický potok
Nádraží Krč
Prague Esko
Nemocnice Krč
Nové Dvory
Libuš
Písnice
Písnice depot
Depo Písnice
Map of metro Line D

Line D (Czech: Linka D) is an under-construction line of the Prague Metro. The planned line will be 10.6 km (6.6 mi) long and have ten stations, running from Náměstí Míru to Depo Písnice. It will connect with Line A at Náměstí Míru and Line C at Pankrác.

Construction began in April 2022. The line is being built in stages, with the first section between Pankrác and Nové Dvory expected to open in the second half of 2032. Line D is planned to operate with fully automated driverless trains.