Line C (Rome Metro)
| Line C | |||
|---|---|---|---|
| Overview | |||
| Owner | ATAC | ||
| Locale | Rome, Italy | ||
| Termini |
| ||
| Stations | 24 | ||
| Service | |||
| Type | Rapid transit | ||
| System | Rome Metro | ||
| Operator | ATAC | ||
| Rolling stock | AnsaldoBreda Driverless Metro | ||
| Daily ridership | 40,999 (2023) | ||
| History | |||
| Opened | 9 November 2014 | ||
| Last extension | 16 December 2025 | ||
| Technical | |||
| Line length | 21.2 km (13.2 mi) | ||
| Character | underground, at-grade and elevated | ||
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) | ||
| Electrification | Overhead lines | ||
| |||
Line C is a Rome Metro line which runs from Monte Compatri-Pantano in the eastern suburbs of Rome, Italy, to its central hub at Colosseo. It is the third metro line built in the city and the first to be fully automated and driverless.
The line has operational interchanges with two other networks: Line A at San Giovanni and Line B at Colosseo.
The network opened in four successive phases: the first section between Monte Compatri-Pantano and Parco di Centocelle debuted on 9 November 2014; the second run to Lodi followed on 29 June 2015; the third section to San Giovanni opened on 12 May 2018; and the central section extending to Porta Metronia and Colosseo opened to the public on 16 December 2025. The line reuses portions of the former Rome-Pantano railway, a historic light rail corridor that represented the final remaining segment of the wider Rome–Fiuggi–Alatri–Frosinone railway.