Line B1 (Tianjin Metro)

Line B1
Overview
Other nameBintie Line 1 (Binhai Metro Line 1)
StatusUnder construction
OwnerTianjin Rail Transit
LocaleBinhai New Area, Tianjin, China
Termini
  • Xinjiayuandong
  • Xinchengsi
Stations22 (Phase 1)
Service
TypeRapid transit
SystemTianjin Rail Transit
Operator(s)Tianjin Binhai New Area Rail Transit Investment Development Co., Ltd
DepotHuanggang depot
Rolling stockCRRC Tangshan 6 cars type A rolling stock
Technical
Line length22.5 km (14.0 mi) (Phase 1 North section)
31.5 km (19.6 mi) (Phase 1 total)
Number of tracks2
Track gauge1,435 mm (4 ft 8+1⁄2 in)
Electrification1.5 kV DC Overhead catenary contact
Operating speed80 km/h (50 mph) (Maximum design speed)

Line B1 of Tianjin Metro is an under construction metro line serving Tianjin, China. The Phase 1 Northern section of Line B1 is spanning 22.5 km long, with a total investment of 21.89 billion RMB. Line B1 is known as the "north-south central axis" of Binhai New Area, spanning 31.5 km with all 22 stations underground and a total investment of 27.6 billion RMB. Line B1 is scheduled to commence operation by the end of 2026.

As of March 2025, the main structures of 16 stations have been completed, 13 out of 19 stations is connected.