Line B1 (Tianjin Metro)
| Line B1 | |
|---|---|
| Overview | |
| Other name | Bintie Line 1 (Binhai Metro Line 1) |
| Status | Under construction |
| Owner | Tianjin Rail Transit |
| Locale | Binhai New Area, Tianjin, China |
| Termini |
|
| Stations | 22 (Phase 1) |
| Service | |
| Type | Rapid transit |
| System | Tianjin Rail Transit |
| Operator(s) | Tianjin Binhai New Area Rail Transit Investment Development Co., Ltd |
| Depot | Huanggang depot |
| Rolling stock | CRRC Tangshan 6 cars type A rolling stock |
| Technical | |
| Line length | 22.5 km (14.0 mi) (Phase 1 North section) 31.5 km (19.6 mi) (Phase 1 total) |
| Number of tracks | 2 |
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
| Electrification | 1.5 kV DC Overhead catenary contact |
| Operating speed | 80 km/h (50 mph) (Maximum design speed) |
Line B1 of Tianjin Metro is an under construction metro line serving Tianjin, China. The Phase 1 Northern section of Line B1 is spanning 22.5 km long, with a total investment of 21.89 billion RMB. Line B1 is known as the "north-south central axis" of Binhai New Area, spanning 31.5 km with all 22 stations underground and a total investment of 27.6 billion RMB. Line B1 is scheduled to commence operation by the end of 2026.
As of March 2025, the main structures of 16 stations have been completed, 13 out of 19 stations is connected.