Line 6 (Nanjing Metro)
| Line 6 | |||
|---|---|---|---|
| Overview | |||
| Status | Under construction | ||
| Owner | Nanjing Metro | ||
| Locale | Nanjing, Jiangsu, China | ||
| Termini |
| ||
| Stations | 19 | ||
| Service | |||
| Type | Rapid transit | ||
| System | Nanjing Metro | ||
| Operator | Nanjing Metro | ||
| Depot | Qixiashan Depot | ||
| Technical | |||
| Line length | 32.365 km (20.111 mi) | ||
| Number of tracks | 2 | ||
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) | ||
| Electrification | 1.5 kV DC Overhead catenary contact | ||
| Operating speed | 100 km/h (62 mph) (Maximum design speed) | ||
| |||
Line 6 of the Nanjing Metro is an under construction metro line in Nanjing, Jiangsu, China. The earliest plan should have commenced operation in 2024, but it was later changed to the end of 2025, then expected to commence operation in the third quarter of 2026. According of the official announcement, the entire line will commence operation in the second half of 2026.
Once this line is opened, it will have a direct through service via Line S1 to Lukou Airport and Line S7.