Line 5 (São Paulo Metro)

São Paulo Metro Line 5 (Lilac)
Overview
StatusOperational
Owner Government of the State of São Paulo
LocaleSão Paulo, Brazil
Termini
Connecting lines
  • Current:
    • Line 1 (São Paulo Metro) Line 2 (São Paulo Metro)
    • Line 17 (São Paulo Metro)
  • Planned:
Stations17 in operation
2 in project
Websitetrilhos.motiva.com.br/viamobilidade5
Service
TypeRapid transit
SystemSão Paulo Metro
Operator Motiva Linhas 5 e 17
Depot(s)Capão Redondo rail yard
Guido Caloi rail yard
Rolling stock
History
Work began1998
OpenedOctober 20, 2002 (October 20, 2002)
Last extensionSeptember 28, 2018
Technical
Line length19.9 km (12.4 mi)
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
ElectrificationOverhead line, 1,500 V DC
Operating speed80 km/h (50 mph)
SignallingBombardier CITYFLO 650 CBTC
Route map

Jardim Ângela
Comendador Sant'Anna
Up arrow
Planned
Capão Redondo rail yard
Capão Redondo
Campo Limpo
Vila das Belezas
Giovanni Gronchi
Guido Caloi rail yard
Santo Amaro
Largo Treze
Adolfo Pinheiro
Alto da Boa Vista
Borba Gato
Brooklin
Line 17 (São Paulo Metro)
Campo Belo
Line 17 (São Paulo Metro)
Eucaliptos
Moema
Bicicletas train park
AACD–Servidor
Hospital São Paulo
Santa Cruz
Line 1 (São Paulo Metro)
Chácara Klabin
Line 2 (São Paulo Metro)

Line 5 (Lilac) (Portuguese: Linha 5–Lilás) is one of the six lines that make up the São Paulo Metro and one of the 13 lines that make up the Metropolitan Rail Transportation Network. The line transports about 600,000 people every business day, and since August 2018 it is operated by the private company Motiva Linhas 5 e 17.

The southern section of the line, between Largo Treze and Capão Redondo was completed in 2002 and was envisioned as a railway line of the CPTM called Line G. The project was transferred to the São Paulo Metro and renamed to Line 5 - Lilac. A northern extension connecting it with the rest of the São Paulo Metro network started construction 2009 with a completion deadline of 2013. The project stalled due to issues with property acquisition and restarted in 2011. The completion deadline of the extension has been delayed several times, but it has been reached on 8 April 2019.

Identification placard at Capão Redondo station
Alstom train in Line 5