Line 5 (Chongqing Rail Transit)

Line 5
5
A train of Line 5 at Tiaodeng station
Overview
Native name重庆轨道交通5号线
StatusOperational
OwnerChongqing City Transportation Development & Investment Group
Line number5
LocaleChongqing, China
Termini
Stations32
Service
TypeRapid transit
SystemChongqing Rail Transit
OperatorChongqing Rail Transit Operation Co., Ltd.
History
Opened28 December 2017 (2017-12-28)
Technical
Line length48.36 km (30.05 mi)
Number of tracks2
Track gauge1,435 mm (4 ft 8+1⁄2 in)
Electrification1500 V DC overhead line
Operating speed100 km/h (62 mph)
Route map

Yuegangbeilu
Shizishan depot
Yuegang Ave.
Chunxuan Ave.
Central Park West
Lujiagou
Ganyue Ave.
Yuhegou
The EXPO Garden Center
Danhe
Huxiajie
Chongguang
Hemulu
Renhe
Dazhulin depot
Xingfu Square
Ranjiaba
Dalongshan
Dashiba
Zhongshutuo
Hongyancun Bridge
across Jialing River
Hongyancun
Xietaizi
1 18
Shiqiaopu
Shixinlu
Bashan
Fengxilu
Chongqing
W. Station
Bus interchange Chongqing West railway station
Huayan Temple
Huachenglu
Banshan
Zhongliangshan
Jinjianlu
Huayan Center
Jiangtiao line
Jin'aoshan
Zhongliangshan depot
Tiaodeng
Shilinsi
DC 1.5 kV
AC 25 kV
Zhongliang Mts.
Jiulongyuan
Shuangfu
Xiangtang
Shuangfu depot
Jiangjin High-speed Railway
Jiangjin North railway station
Shengquansi
Jijiang Rail Transit Bridge
across Yangtze River
Jijiang
Dingshan
=
Virtual interchange: transport
card only, re-entry required.

Line 5 of CRT is a rapid transit line in Chongqing, China, which opened on 28 December 2017.