Line 4 (Changsha Metro)

Line 4
Line 4 train arriving at Guangda Station
Overview
StatusOperational
OwnerChangsha Government
LocaleChangsha, Hunan, China
Termini
Stations25
Service
TypeRapid transit
SystemChangsha Metro
Services1
OperatorChangsha Metro Corporation
Rolling stock6-car Type B
History
Opened26 May 2019 (2019-05-26)
Technical
Line length33.5 km (20.82 mi)
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+1⁄2 in)

Line 4 of the Changsha Metro (Chinese: 长沙地铁四号线; pinyin: Chǎngshā Dìtiě Sì Hào Xiàn) is a rapid transit line in Changsha. It began trial operations without passengers on 29 December 2018. The line opened on 26 May 2019 with 25 stations.