| Baixada Santista LRT Line 1 |
|---|
 |
|
| Status | Operational |
|---|
| Owner | Empresa Metropolitana de Transportes Urbanos |
|---|
| Locale | |
|---|
| Termini | |
|---|
| Stations | 15 |
|---|
|
| Type | Light rail transit |
|---|
| System | Baixada Santista Light Rail |
|---|
| Operator | Consórcio BR Mobilidade |
|---|
| Depot | Port rail yard |
|---|
|
| Opened | 31 January 2016 (2016-01-31) |
|---|
|
| Line length | 11.5 km (7.1 mi) |
|---|
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
|---|
| Electrification | Overhead line |
|---|
| Operating speed | 25 km/h (16 mph) |
|---|
|
|
|
|
|
|
Tatico |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
to Mairinque |
|
|
|
|
Samaritá |
|
|
|
|
Rio Branco |
|
|
|
|
Jardim Quarentenário |
|
|
|
|
Ponte Nova |
|
|
|
|
Ponte dos Barreiros |
|
|
|
|
Under construction |
|
|
|
|
Barreiros |
|
|
|
|
|
|
|
|
|
Mascarenhas de Moraes |
|
|
|
|
São Vicente |
|
|
|
|
Antônio Emmerich |
|
|
|
|
Nossa Senhora das Graças |
|
|
|
|
José Monteiro |
|
|
|
|
Itararé |
|
|
|
|
João Ribeiro |
|
|
|
|
|
|
|
|
|
José Menino Tunnel |
|
|
|
|
Nossa Senhora de Lourdes |
|
|
|
|
Pinheiro Machado |
|
|
|
|
Bernardino de Campos |
|
|
|
|
Ana Costa |
|
|
|
|
Washington Luís |
|
|
|
|
Conselheiro Nébias |
|
|
|
|
Porto |
|
|
|
|
Tamandaré |
|
|
|
|
Porto rail yard |
|
|
|
|
Carvalho de Mendonça |
|
|
|
|
Guarujá |
|
|
|
|
Xavier Pinheiro |
|
|
|
|
Universidades I/II |
|
|
|
|
Campos Salles |
|
|
|
|
Mercado |
|
|
|
|
Bittencourt |
|
|
|
|
Paquetá |
|
|
|
|
Poupatempo |
|
|
|
|
José Bonifácio |
|
|
|
|
Mauá |
|
|
|
|
São Bento |
|
|
|
|
Valongo |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nove de Abril |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Line 1: Barreiros ↔ Porto is currently the only operational line of Baixada Santista Light Rail in São Paulo state, Brazil. It opened on 31 January 2016. It is 11.5 km (7.1 mi) long and has 15 stations in operation, all of them at-grade. The system is operated by Consórcio BR Mobilidade.