Line 19 (Shanghai Metro)
| Line 19 | |
|---|---|
| Overview | |
| Other name | M9 (planned name) |
| Native name | 上海地铁19号线 |
| Status | Under construction |
| Locale | Baoshan, Jing'an, Hongkou, Pudong, Xuhui, Minhang Shanghai |
| Termini |
|
| Connecting lines | 2 4 6 7 8 9 10 11 12 13 14 15 18 20 23 |
| Stations | 34 |
| Website | www |
| Service | |
| Type | |
| System | |
| Operator | TBA |
| Depot(s) | Chengjiang Road Depot Tieshan Road Yard |
| Rolling stock | Class A 6-car trains |
| History | |
| Planned opening | December 2027 |
| Technical | |
| Track length | 46.2 km (28.7 mi) |
| Number of tracks | 2 |
| Character | Underground and elevated |
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
| Electrification | Overhead lines (1500 volts) |
| Operating speed | 80 km/h (50 mph) |
Line 19 is an under construction subway line on the Shanghai Metro. Its termini are planned to be Baoshan Railway Station and Hongjian Road. It is planned to be 46.2 km (28.7 mi) in length, with 34 stations. The line hopes to ease car congestion along Pudong South Road, as well as reduce crowding on the southern part of line 8, and the northern sections of lines 1 and 3.
The line was announced by the Municipal government in 2016 and is planned to finish construction and open between Baoshan Railway Station and Yierba Jinian Road in December 2027. The south section between Hongjian Road and Shibo Avenue is planned to finish construction in 2029, and the middle section between Shibo Avenue and Yierba Jinian Road in 2031.