Line 17 (Chengdu Metro)

Line 17
Line 17 train entering Huangshi station, in which has transferred to Line 19
Overview
StatusOperational
OwnerCity of Chengdu
LocaleChengdu, Sichuan
Termini
Stations21
Service
TypeRapid transit
SystemChengdu Metro
OperatorChengdu Metro Corporation
DepotWutongmiao Depot (五桐庙停车场)
History
Opened18 December 2020 (2020-12-18)
Technical
Line length31.47 km (19.6 mi)
Number of tracks2
Characterunderground
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
ElectrificationOverhead line, 25 kV 50 Hz AC
Operating speed140 km/h

Line 17 of the Chengdu Metro is a metro line in Chengdu. The whole line is 30.286 km when Phase 2 opens. The line uses 8-car Type-A trains operating up to 140 km/h speed powered by 25kV AC overhead lines.

Phase 1 runs from Jinxing station in Wenjiang District to Jitouqiao station in Wuhou District. Phase 1 is 26.145 km long with 5.5 km running elevated and 20.6 km running underground. There are 9 stations with 2 elevated stations and 7 underground stations.

Phase 2, opened on September 17th 2025, extended the line west across central Chengdu to Gaohong station. It is 24.8 km long, all underground with 18 additional stations.