Line 13 (Shenzhen Metro)

Line 13
A train of Shenzhen Metro Line 13
Overview
Other name(s)Shiyan Line
(石岩线; 石岩線; shíyán xiàn)
StatusOperational
LocaleBao'an, Nanshan and Guangming districts
Shenzhen, Guangdong
Termini
Stations26
Color on map     Mandarin Orange (#de7c00)
Service
TypeRapid transit
SystemShenzhen Metro
Services1
OperatorMTR CREC Metro (Shenzhen) Company Limited
History
Opened28 December 2024 (2024-12-28) (Phase 1 South Section)
Last extension28 June 2026 (2026-06-28) (Phase 2 North Section)
Technical
Line length41.8km (Phase 1)
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+1⁄2 in)
ElectrificationOverhead Line, 1,500 V DC
Operating speed100 km/h (62 mph)
Route map

Lisonglang
Xiacun
Shangcun
Gongming Square
Xinzhuang
Jiangwei
Gongming Depot
Yueliang Road
Fenghuang Town
Deya Road
6B Up arrow to SUAT
Guangmingcheng
Hong'ao Park
Shangwu
Shiyan
Luozu
Yingrenshi
Baiwang
Liuxiandong
Shigu
Xili High Speed Railway Station
Hi-Tech North
Hi-Tech Central
1 to Luohu Right arrow
Shenzhen University
Yuehaimen
Keyuan
Houhai
Talent Park
Neihu Stabling Yard
Shenzhen Bay Checkpoint
Up arrow Phase 1
Phase 2 (Southern Extension) Down arrow
Tide Park
Opera House
Dongjiaotou

Line 13 of the Shenzhen Metro is one of the four new operational metro lines of the metro's Phase IV expansion in the city of Shenzhen, Guangdong. The line first opened on 28 December 2024.

The 6.36 km Phase 1 South section between Shenzhen Bay Checkpoint and Hi-Tech Central opened on 28 December 2024. The Phase 1 North section (except Xili High Speed Railway Station) entered service on 28 December 2025 at 10:18 am, connecting Hi-Tech North to Shangwu (except Xili High Speed Railway Station). The Phase 2 North section opened on 28 June 2026 at 11:18 am. The Phase 2 South section is expected to open in 2027, and Xili High Speed Railway Station is expected to open in 2029. The first phase of the line is 23 km (14 mi) long and uses eight car type A trains with a maximum operating speed of 100 km/h (62 mph).

On 15 March 2026, Phase 2 North section extension of Line 13 began trial operation without passengers.

Line 13 is operated by MTR CREC Metro (Shenzhen) Company Limited, a consortium comprising MTR Consulting (Shenzhen) Co. Ltd (owns 83%), China Railway Electrification Bureau (Group) Co. Ltd (owns 15%), and a subsidiary of the Shenzhen Municipal Government (owns 2%) under a Public-Private Partnership (PPP) model for a term of 30 years.