Line 13 (Chengdu Metro)

Line 13
Overview
StatusOperational
OwnerChengdu
LocaleChengdu, China
Termini
  • Wayaotan
  • Long'an
Stations21
Service
TypeRapid transit
SystemChengdu Metro
Services1
OperatorChengdu Metro Limited
Rolling stock8-car Type A (Driverless)
History
Opened16 December 2025 (2025-12-16)
Technical
Line length29.07 km (18.06 mi)
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+1⁄2 in)
ElectrificationOverhead catenary, 25 kV AC
Operating speed100 kilometres per hour (62 mph) (maximum)

Line 13 of the Chengdu Metro (Chinese: 成都地铁13号线) is a metro line in Chengdu, Sichuan, China. The first phase of the line officially opened on 16 December 2025. This entire section is underground. Line 13 is the first Chengdu Metro line using AC system fully automatic operation and Line 13 rolling stock is the first urban fully automatic train with a maximum designed speed of 140 km/h in China.