Line 12 (Hangzhou Metro)

Line 12
Overview
StatusUnder construction
OwnerHangzhou Metro
LocaleHangzhou, Zhejiang, China
Termini
Stations15 (Phase 1)
19 (Total)
Service
TypeRapid transit
SystemHangzhou Metro
OperatorHangzhou Metro
DepotShuangpu Depot
Technical
Line length26.05 km (16.19 mi) (Phase 1), including:
● 24.3 km (15.1 mi) (Northern section)
● 1.7 km (1.1 mi) (Southern section)
Number of tracks2
Track gauge1,435 mm (4 ft 8+1⁄2 in)
Electrification1.5 kV DC Overhead catenary contact
Operating speed100 km/h (62 mph) (Maximum design speed)

Line 12 of the Hangzhou Metro (Chinese: 杭州地铁12号线; pinyin: Hángzhōu dìtiě shíèr hào xiàn) is an under construction metro line in Hangzhou, Zhejiang, China. This is the only metro line of Hangzhou Metro runs on north-south in the western part of Hangzhou. The entire line will be fully connected by February 2027 and is expected to open by the end of 2027.

The total investment of Line 12 is 21.082 billion RMB with a construction period of 5 years.

Line 12 will be the first metro line of Hangzhou Metro system using GoA4 automation level.