Line 12 (Wuhan Metro)
| Line 12 | |||
|---|---|---|---|
Line 12 train at Depot | |||
| Overview | |||
| Status | In operation (Phase 1) | ||
| Owner | Wuhan Metro | ||
| Locale | Wuhan, Hubei, China | ||
| Termini |
| ||
| Stations | 37(23 in operation) | ||
| Service | |||
| Type | Rapid transit | ||
| System | Wuhan Metro | ||
| Operator | Wuhan Metro Line 12 Construction and Operation Co | ||
| Depot | Banqiao Parking lot | ||
| History | |||
| Opened | 1 May 2026 | ||
| Technical | |||
| Line length | 35.32 km (21.95 mi) (in operation) 59.9 km (37.2 mi) (total) | ||
| Number of tracks | 2 | ||
| Character | Underground | ||
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) | ||
| Electrification | 1,500 V DC Third rail contact | ||
| Operating speed | 80 km/h (50 mph) (Maximum design speed) | ||
| |||
Line 12 of the Wuhan Metro (Chinese: 武汉地铁12号线) is a rapid transit line in Wuhan, Hubei, China. The first phase has total length of 35.32 km (21.95 mi) with 23 stations in operation. Line 12 has purchased a total of 79 trains. In the first phase, 43 trains with GoA4 automation level will be put into operation. Line 12 is the second subway line in Central China using fully automated metro line with GoA4 automation level.
Line 12 began construction in 2017. Construction was started on 24 January 2025 and comprises one depot and two parking lots with a total investment of about 80 billion RMB and begin received first 24 set of rolling stock on 28 September 2025. The first phase of Line 12 was officially put into operation on 1 May 2026 at 9:16 am.