Line 1 (Beijing Subway)

Line 1
A Line 1 train entering Sihui station
Overview
Other name(s)M1 (planned name)
Fuba line (Chinese: 复八线, for Fuxingmen to Sihuidong section)
StatusOperational
LocaleChaoyang, Dongcheng, Xicheng, Haidian, and Shijingshan districts
Beijing
Termini
Stations23 (not accounting for Batong Line, but including Gaobeidian)
Color on map     Dark red
Service
TypeRapid transit
SystemBeijing Subway
Operator(s)Beijing Mass Transit Railway Operation Corp., Ltd.
Depot(s)Gucheng, Sihui Depots
Rolling stock6-car Quasi-Type B (DKZ4, SFM04)
Daily ridership1,234,900 (2014 Avg.)
1,536,900 (2014 Peak)
History
OpenedJanuary 15, 1971 (1971-01-15)
Technical
Line length31.4 km (19.5 mi)
CharacterUnderground, at-grade
Track gauge1,435 mm (4 ft 8+1⁄2 in)
Electrification750 V DC third rail
Operating speed80 km/h (maximum service speed)
Route map

101 Gaojing (Station 53)
102 Fushouling (under renovation)
Yongding River diversion canal
103 Pingguoyuan
connects Jingmen railway
Gucheng depot
104 Gucheng
101 railway (for military purpose only)
105 Bajiao Amusement Park (closed for renovation)
106 Babaoshan
107 Yuquan Lu
108 Wukesong
109 Wanshou Lu
110 Gongzhufen
Left arrow outer – inner Right arrow
111 Military Museum
Yongding River diversion canal
112 Muxidi
Line 16 (out-of-system interchange)
113 Nanlishi Lu
connects Line 2
114 Fuxingmen
Left arrow outer – inner Right arrow
Line 19 crossing
115 Xidan
116 Tian'anmenxi
117 Tian'anmendong
118 Wangfujing
connects Line 5
119 Dongdan
120 Jianguomen
Left arrow inner – outer Right arrow
connects Line 2
121 Yong'an Li
122 Guomao
Left arrow inner – outer Right arrow
123 Dawang Lu
124 Sihui
connects Batong line (for depot trains only)
Sihui depot
125 Sihuidong

Line 1 of the Beijing Subway (Chinese: 北京地铁1号线; pinyin: Běijīng dìtiě yīhào xiàn) is the oldest and one of the busiest lines of Beijing's mass transit rail network. The line runs underneath Chang'an Avenue, the city's grand east–west thoroughfare, right through the heart of Beijing with stops on either side of Tiananmen Square. Line 1's color is dark red. Through operation with the Batong line started on August 29, 2021.