Leipzig–Dresden railway

Leipzig–Dresden railway
Leipzig–Dresden railway
Overview
Line number6363
LocaleSaxony, Germany
Termini
Service
Route number500
Technical
Line length116.098 km (72.140 mi)
Number of tracks2
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
Minimum radius270 m (886 ft)
Electrification15 kV/16.7 Hz AC overhead catenary
Operating speed200 km/h (125 mph)
Maximum incline0.7%
Route map

-0.15
Leipzig Hbf
123 m
~3.4
3.50
Leipzig-Sellerhausen
125 m
3.68
Püchauerstraße junction
4.00
Wurzener Straße bridge (15 m)
4.69
Leipzig-Paunsdorf
130 m
4.726
Theodor-Heuss-Straße bridge (17.5 m)
↙
5.6
Leipzig-Engelsdorf KV junction
6.00
6.08
Leipzig-Engelsdorf freight yard
Industriegelände Ost
7.02
7.71
Leipzig-Engelsdorf Hp
Leipzig-Engelsdorf Ost
130 m
 
8.59
Althen junction
(freight line track to Borsdorf)
9.1
10.48
Parthe (14 m)
11.45
Borsdorf (Sachs)
127 m
14.00
Steinweg bridge (10 m)
14.87
Gerichshain
140 m
16.10
Posthausen
17.70
Machern (Saxony)
142 m
~18.5
Machern crossover
19.18
Bk Zauche
(closed 1996)
21.43
Altenbach
125 m
23.38
Bennewitz,
formerly Wurzen West
23.87
Bundesstraße 107 number.svg B 107 bridge (13,8 m)
24.66
Mulde bridge
24.81
Triebgraben bridge (56 m)
25.45
Dehnitzer Weg bridge (15 m)
25.70
Wurzen
124 m
to Glauchau
to Eilenburg
Bundesstraße 6 number.svg B 6 bridge (11.24 m)
28.65
Kornhain D junction
140 m
32.62
Kühren
155 m
35.76
Dornreichenbach
152 m
43.24
Dahlen
154 m
52.79
Oschatz
128 m
52.855
Bahnhofsstraße (9 m)
53.24
Schmorkau siding
strategic railway to Röderau
54.754
factory road bridge (15 m)
57.87
Bornitz (Oschatz)
64.156
Rostocker Straße (14.5 m)
65.15
Riesa Stw W5 junction
from Chemnitz and Nossen
65.87
Riesa
106 m
66.46
Elbe bridge
67.80
flood bridge
68.30
Röderau Bogendreieck junction
68.505
Zeithainer
Straße (12.5 m)
| → from Jüterbog
69.55
Zeithain Bogendreieck junction
72.22
Elbe-Elster barge canal (11 m)
72.26
Glaubitz (bei Riesa)
100 m
74.80
Nünchritz
since 2003
75.542
Weißiger Straße (17 m)
77.41
Weißig (bei Großenhain)
no passengers since 2003
78.063
factory road bridge (12,6 m)
79.75
84.70
Priestewitz
147 m
92.94
Oberau Tunnel (513 m; opened out 1933)
95.69
Niederau
133 m
97.50
Weinböhla
since 2002
98.28
Sörnewitzer Straße (13.8 m)
98.595
Köhlerstraße (12 m)
98.60
Elbgaubad junction
100.00
Auerstraße (15 m)
100.26
Coswig B junction
113 m
101.475
Dresdner Straße (11 m)
101.93
Coswig (b Dresden)
110 m
103.84
Radebeul-Zitzschewig
110 m
104.24
Lößnitz junction
104.40
Johannisbergstraße (15 m)
105.78
Radebeul Kötzschenbroda
113 m
105.86
Bahnhofsstraße (15 m)
106.446
Hainstraße (10.8 m)
107.78
Radebeul-Weintraube
114 m
109.45
Radebeul Ost
113 m
110.44
Forststraße (10,8 m)
110.8
111.351
Leipziger Straße (21 m)
111.541
Trachau station bridge (12.75 m)
111.57
Dresden-Trachau
115 m
111.987
Gaustraße (11.2 m)
112.312
Alttrachau (14 m)
112.795
Rehefelder Straße (25 m)
112.91
Dresden-Pieschen junction
to Dresden-Neustadt Stw 8/6 junction
113.26
Dresden-Pieschen
115 m
113.284
Trachenberger Straße (22.8 m)
113.92
Großenhainer Straße (65 m)
114.442
Bundesstraße 170 number.svg
B 170
Hansastraße
(49 m)
114.678
Friedensstraße (24.42 m)
114.917
Johann-Meyer-Straße (37.5 m)
Dresden Bischofsplatz
115.087
Fritz-Reuter-Straße (43 m)
115.116
Conradstraße (23.5 m)
Dresden-Neustadt freight yard
115.94
Dresden-Neustadt
118 m
116.4
65.8
km-change LD/Děčín line
Source: German railway atlas

The Leipzig–Dresden line is a German railway line. It was built by the Leipzig–Dresden Railway Company between 1837 and 1839. It was the first long-distance railway and the first railway using only steam traction in Germany. It also included the first standard gauge railway tunnel in continental Europe. The Dresden Leipzig railway station was the first railway station in Dresden, the capital of Saxony. It was the terminus of the Leipzig-Dresden railway.

Work to upgrade the line as German Unity Transport Project (Verkehrsprojekt Deutsche Einheit) no. 9 has been underway since 1993. According to the federal government €1.115 billion of an estimated total cost of €1.451 billion had been invested in the project by the end of 2013 (net present value for planning, land acquisition and construction costs). Funds of €336 million were still available.